Selected multifamily renovation engagements

Renovation delivery, powered by the operating system behind the turn.

Acceler8 combines field execution with technology built to manage scope, crews, schedules, documentation, approvals, quality control, and closeout across units at scale.

Begin with one representative unit or a small renovation group. Final scope, schedule, and pricing follow field verification.
Renovation control
Scope + finish scheduleApproved
Crew coordinationIn sequence
Field documentationLive
Quality controlPhoto-verified
Portfolio visibilityUnit by unit
Defined scopes Coordinated crews Documented quality Scalable visibility
Three levels. One disciplined process.

Choose the right level of investment

Each package begins with a unit walk. We tailor the final scope to unit condition, floor plan, occupancy strategy, approved finish standards, and property goals.

01 / Refresh

Refresh

Restore appeal

Best for: Stable units that need a clean, current, rent-ready presentation without a major renovation.

  • Interior paint and preparation
  • Professional turnover cleaning
  • Minor drywall, trim, caulk, and hardware corrections
  • Cabinet and vanity touch-ups where serviceable
  • Selected fixture and accessory replacement
  • Targeted surface refinishing
  • Final QC walk and photo documentation
03 / Full Interior

Full Interior

Reposition the asset

Best for: Units requiring comprehensive redesign, deeper rehabilitation, or alignment with a new property standard.

  • Interior demolition and preparation as required
  • New flooring, paint, trim, and finish package
  • Kitchen cabinet replacement or reconfiguration
  • New counters, backsplash, sink, faucet, and hardware
  • Bathroom vanity, fixtures, surround, and accessories
  • Lighting, devices, doors, and closet updates
  • Coordinated plumbing, electrical, and repair trades
  • Detailed punch, clean, QC, and turnover package
Technology at the center

Control the work without losing sight of the asset

The same operational platform behind Acceler8 turns becomes the control layer for renovation delivery—connecting decisions in the office with execution in the field.

Scope control

Package, options, finishes, exclusions, allowance items, and approval points are defined before work begins.

Crew coordination

Trades, handoffs, access, and dependencies are managed against one project sequence.

Field proof

Progress and completion documentation remain tied to the unit and the approved work.

Approval visibility

Hidden conditions and owner-requested changes are documented before added work proceeds.

Quality control

Punch items, cleaning, QC, and closeout are treated as part of delivery—not an afterthought.

Scale by design

A repeatable operating record supports consistent execution across floor plans, buildings, and renovation phases.

How the project moves

From field assessment to documented delivery

01

Assess

Walk the unit and document existing conditions.

02

Define

Select the package, options, finishes, and approval points.

03

Execute

Coordinate crews, schedule, documentation, and field quality.

04

Deliver

Complete punch, professional cleaning, QC, and closeout.

Start with a representative unit

Let’s evaluate your next renovation.

We’ll review existing conditions, property goals, finish expectations, and schedule constraints, then recommend the right package and prepare a defined scope.

Request a renovation review

Package descriptions are planning guides, not fixed-price offers. Final scope, pricing, schedule, and availability depend on field conditions, unit size, material selections, access, permitting, and written approval.